OG0-093 TOGAF 9 is one of the most popular and highest-paid certifications in the industry. The Open Group OG0-093 TOFAF 9 is a certification focused on the fundamentals of IT that aims to promote practices. This certification is the best source of recognition for people who evaluate and control the understanding of ArchiMate specifications. In this guide, we will cover The Open Group OG0-093 Certification exam, The Open Group OG0-093 Certification Salary and all aspects of The Open Group OG0-093 Certification.
NEW QUESTION 23
Complete the sentence. According to TOGAF, an objective of Phase G, Implementation Governance, is to______________.
- A. operate the governance framework
- B. ensure the baseline architecture continues to be fit-for-purpose
- C. establish an architecture change management process for the architecture finalized in the previous ADM phase
- D. assess the performance of the architecture and make recommendations for change
- E. ensure conformance with the defined architecture by the implementation projects
Answer: E
Explanation:
Section: Part 1
NEW QUESTION 24
Scenario:
Please read this scenario prior to answering the Question
Your role is that of Lead Enterprise Architect within a vacation property management firm that has been growing through acquisition. The firm manages over 200 resort properties across North America. Many of the resort properties use the same internal IT systems that they used before they were acquired. Until recently, the only requirement that has been placed on each property is that they use a standard financial reporting system to report their financial results to the headquarters on a weekly basis.
The CEO has stated his concerns about the inefficiencies of the current approach and identified the need to change. He has defined a new strategic vision that will enhance the business by standardizing its operations across the network to provide consolidated financial, human resources, logistics, sales and marketing, and yield management. He has also stated that he expects results by the end of the current fiscal year.
These changes will provide the company with improved utilization of its capacity and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising into key markets to improve yields.
The firm has a mature enterprise architecture practice and uses TOGAF 9 as the method and guiding framework. The CIO is the sponsor of the activity.
In planning this change, the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing the entire firm, including detailed requirements and recommendations.
Based on the recommendations from the initial study, the firm has taken the decision to adopt a packaged suite of integrated applications that is tailored to the needs of the hospitality industry.
Refer to the scenario
You have been asked by the Chief Architect to justify the best approach for architecture development to realize the CEO's vision.
Based on TOGAF 9, which of the following is the best answer?
- A. You recommend that the team focus on architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement.
You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and secure. - B. You recommend that this engagement define the baseline Technology Architecture first in order to assess the current infrastructure capacity and capability. Then the focus should be on transition planning and architecture deployment. This will identify retirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.
- C. You recommend that the target architecture is defined first, followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. This will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.
- D. You recommend that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.
Answer: B
NEW QUESTION 25
Scenario
Please read this scenario prior to answering the Question
Your role is that of Lead Enterprise Architect for a chain of convenience stores. The chain includes over
15,000 retail outlets throughout the Asia-Pacific region. Each store in the chain is an independently owned and operated franchise. The stores operate 24 hours a day and 7 days a week. Many of the stores have been with the franchise for more than 10 years and still use the original IT systems deployed at that time.
The CEO of the chain has stated his concerns about the inefficiencies of the current systems and identified the need to change. He has defined a new strategic vision that will enhance the business by providing its franchisees new services to help them compete with other retail outlets and online retailers. This strategy is part of the long-term commitment to enhance the brand image and increase revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year.
These changes will provide the chain with improved products, and more efficient operations. The stores will also act as delivery and return locations for a large online retailer which will further increase the number of potential customers. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising and new products to specific regions.
The chain has a mature Enterprise Architecture practice based in its headquarters and uses the TOGAF standard as the method and guiding framework. The CIO is the sponsor of the activity.
The Chief Architect engaged the services of a leading consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations.
Based on the recommendations from the initial study, the decision for the chain to adopt a packaged suite of integrated applications that is tailored to the needs of the franchise has been taken.
Refer to the scenario
You have been asked by the Chief Architect to propose the best approach for architecture development to realize the CEO's vision.
Based on TOGAF, which of the following is the best answer?
- A. You propose that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.
- B. You propose that the team focus on architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement. You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and secure.
- C. You propose that this engagement define the baseline architecture first in order to assess the current infrastructure capacity and capability. The initial priority is to understand the proble,. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.
- D. You propose that the target architecture is defined first, followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.
Answer: D
NEW QUESTION 26
Scenario:
Please read this scenario prior to answering the Question
You are serving as the Lead Architect for an enterprise architecture project team within a leading medical device manufacturer that specializes in miniature devices. The latest product under development is a tiny wireless device that can be implanted in the brain and can deliver a precise electric shock when the wearable Pain Control Unit (PCU) detects an increase in stress induced by the onset of a migraine headache.
This technology will be a breakthrough in the treatment of this condition, and several competitors are striving to be the first to introduce a product into the market. However, all of them must demonstrate the effectiveness and safety of their products in a set of clinical trials that will satisfy the regulatory requirements of the countries in the target markets.
The Enterprise Architecture group within the company has been engaged in an architecture development project to create a secure networked collaboration system that will allow researchers at its product development laboratories worldwide to share information about their independent clinical trials.
The Enterprise Architecture group is a mature organization that has been utilizing TOGAF for several years. They use the TOGAF 9 ADM with extensions required to support current good manufacturing practices and good laboratory practices in their target markets. Due to the highly sensitive nature of the information that is managed, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant for each domain. A corresponding Security Architecture has been defined.
The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity. She has stated that the changes to the enterprise architecture for the new system will need to be rolled out on a geographic basis that will minimize disruptions to ongoing clinical trials. The work will need to be done in stages and rolled out in geographical regions.
Refer to the Scenario
You have been asked to recommend the approach to identify the work packages that will be included in the Transition Architecture(s).
Based on TOGAF 9, which of the following is the best answer?
- A. Use a Consolidated Gaps, Solutions and Dependencies Matrix as a planning tool. For each gap classify whether the solution is either a new envelopment, purchased solution, or based on an existing product. Group the similar solutions together to define the work packages. Regroup the work packages into a set of Capability Increments to transition to the Target Architecture taking into account the schedule for clinical trials.
- B. Determine the set of Solution Building Blocks required by identifying which Solution Building Blocks need to be developed and which need to be procured. Eliminate any duplicate building blocks. Group the remaining Solution Building Blocks together to create the work packages using a CRUD matrix. Rank the work packages in terms of cost and select the most cost-effective options for inclusion in a series of Transition Architectures. Schedule the roll out of the work packages to be sequential across the geographic regions.
- C. Group the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix into a set of work packages. Using the matrix as a planning tool, regroup the work packages to account for dependencies. Sequence the work packages into the Capability Increments needed to achieve the Target Architecture. Schedule the rollout one region at a time. Document the progression of the enterprise architecture using a state evolution table.
- D. Create an Implementation Factor Assessment and Deduction Matrix and a Consolidated Gaps, Solutions and Dependencies Matrix. For each gap, identify a proposed solution and classify it as new development, purchased solution, or based on an existing product. Group similar solutions together to form work packages. Identify dependencies between work packages factoring in the clinical trial schedules. Regroup the packages into a set of Capability Increments scheduled into a series of Transition Architectures.
Answer: A
NEW QUESTION 27
Which part of the TOGAF document describes an overview of typical architecture deliverables?
- A. ADM Guidelines and Techniques
- B. Architecture Content Framework
- C. Enterprise Continuum & Tools
- D. Architecture Capability Framework
- E. TOGAF Reference Models
Answer: B
NEW QUESTION 28
Which of the following is an objective of Phase G, Implementation Governance?
- A. Finalize the Implementation and Migration Plan
- B. Ensure conformance for the target architecture
- C. Operate the governance framework
- D. Develop the Target Technology Architecture
- E. Establish the resources for architecture governance
Answer: B
Explanation:
Reference http://pubs.opengroup.org/architecture/togaf8-doc/arch/chap13.html
NEW QUESTION 29
Which of the following does the TOGAF ADM recommend for use in developing the Architecture Vision document?
- A. Risk Management Techniques
- B. Business Scenarios
- C. Architecture Principles
- D. Interoperability Analysis
- E. Migration Planning Techniques
Answer: B
NEW QUESTION 30
What are the four architecture domains that the TOGAF standard deals with?
- A. Business, Data, Application, Technology
- B. Application, Data, Information, Knowledge
- C. Baseline, Candidate, Transition, Target
- D. Process, Organization, Strategic, Requirements
- E. Capability, Segment, Enterprise, Federated
Answer: A
Explanation:
Section: Part 2
NEW QUESTION 31
Complete the sentence. According to the TOGAF standard, an ___________ is a representation of a system from the perspective of a related set of _______________.
- A. architecture view, requirements
- B. architecture viewpoint, stakeholders
- C. architecture view, concerns
- D. architecture viewpoint, architecture views
- E. architecture view, stakeholders
Answer: E
Explanation:
Reference https://pubs.opengroup.org/architecture/togaf9-doc/arch/chap03.html
NEW QUESTION 32
Scenario:
Please read this scenario prior to answering the question
Your role is that of a consultant to the Lead Enterprise Architect in a company that develops wind turbines for use in wind farms. The company has three manufacturing facilities, one in North America, one in Asia, and one in Europe. Each of these facilities supplies the power industry in its region.
The company recognizes that the long-term technical potential of wind energy can address the current global dependency on carbon fuels. In order to do so this will require wind turbines to be installed over large areas of higher wild resources. In particular, offshore wind farms can contribute substantially more energy than land stationed trubines.
The research arm of the company has pioneered the development of an offshore wind turbine design, with an improved turbine blade and power system that will produce up to 20% more energy. This will allow the production of significantly more saleable energy. This new design is ready to go into production.
The company has a mature Enterprise Architecture organization that is supported by a cross-functional Architecture Board and uses the TOGAF standard. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
Recently, a pilot architecture project was completed at a single location that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Architecture Board approved the plan for immediate implementation at each plant.
Architecture Contracts have been developed that detail the work needed to implement and deploy the new Automated Test System controller for each location. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each location to ensure consistency.
Refer to the Scenario
You have been asked to recommend the best approach to address the Chief Engineer's concern.
Based on TOGAF 9, which of the following is the best answer?
- A. You use the issued Architecture Contracts to manage the architecture governance processes for the project across the locations. You deploy monitoring tools to assess the performance of the completed blade assembly at each location and develop change requirements if necessary.You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
- B. You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract.You schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
- C. You create an Architecture Contract to manage and govern the implementation and migration process at each location. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract.You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
- D. You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization.You recommend that if a deviation from the Architecture Contract is detected, the Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.
Answer: A
NEW QUESTION 33
What is an objective of the ADM Preliminary Phase?
- A. To create the initial version of the Architecture Roadmap
- B. To select and implement tools to support the Architecture Capability
- C. To develop a vision of the business value to be delivered by the proposed enterprise architecture
- D. To obtain approval for the Statement of Architecture Work
- E. To document the baseline architecture
Answer: B
Explanation:
Section: Part 2
Explanation/Reference:
NEW QUESTION 34
Scenario:
Please read this scenario prior to answering the Question.
The ABC company is a mobile telecommunications company formed through a series of mergers and acquisitions. They are yet to fully integrate the customer service systems for the most recent acquisitions, and as result, customer service has been a major concern for the Chief Technology Officer. Results for the last two quarters have shown that Average Revenue Per User (ARPU) and the customer retention (Churn) rate have fallen below the industry average.
The Corporate Marketing group has published some new findings about customer satisfaction. The customers appear to be switching to AirLight, a competitor, because of superior customer service. The company actually has better coverage in nearly all markets than AirLight, and good roaming agreements that keep rates low for business travelers. But, customer satisfaction has remained low. The Business Strategy group and the Enterprise Architecture group have conducted a high-level project to develop the enterprise-wide strategic plan.
They have developed a business scenario which contains a good conceptual model of what needs to be done, and also identifies the key requirements. This was used in preparing the proposal presented to the Executive Council and the Corporate Board. The planning for the program has been underway for several months. The company has selected TOGAF 9 as the basis for its Enterprise Architecture. The Corporate Board has approved funding for a multi-million Euro conversion to transition to a packaged Customer Service System. It is anticipated that the overall program will take five years to complete, but there are some tactical projects that can commence immediately to address the situation.
The Executive Council has stated that the program should define specific initiatives to enable each regional business unit to create an implementation of the Customer Service System. The implementation must meet the needs of the business unit and still provide the information needed to enable major improvements to the customer.
Refer to the Scenario
You are serving as the Lead Architect for the Performance and Integrity project of the Customer Service System program.
The project has been chartered to address the architecture(s) required to support the Customer Service System from an infrastructure perspective. At the present time, the project team is conducting an architecture development project that is focused on the customer self-service capability, which was defined as part of the earlier strategic planning activities. This capability will enable customers to access their accounts, pay bills, request account reviews, and provision services from any web-enabled device.
The project team has gathered information about the self-service capability, developed a business scenario, and used the results to define an Architecture Vision for achieving the capability.
You have been asked to recommend the course of action to complete the project.
Based on TOGAF 9, which of the following is the best answer?
- A. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information Systems, and Technology domains. In Ftiases E and F, the capability should be broken down into a set of increments that define the Target Architecture. The resulting Solution Building Blocks will provide the basis for the capability increment solutions. The completed Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conducting Compliance Assessments.
- B. In the remaining architecture definition phases, the project team should map out the capability across the Business, Information Systems, and Technology domains. In Phases E and F, the capability should be broken down into a set of increments that are sequenced into Transition Architectures that will lead to the realization of the Target Architecture.
The resulting Solution Building Blocks will then provide the basis for the capability increment solutions. The completed Architecture Definition Document and the implementation end Migration Plan will be submitted for approval. Upon approval, the architecture team will oversee the implementation process through monitoring Architecture Contracts and by conducting Compliance Assessments. - C. In the remaining architecture definition phases, the project team should map out the capability in the Technology domain. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that define the Target Architecture. Where possible, the Solution Building Blocks should be drawn from the Architecture Repository.
The completed Architecture Definition Document and the Implementation and Migration Plan will be submitted for approval. Upon approval, the architecture team will conduct Compliance Assessments to ensure that the Target Architecture is properly implemented. - D. The remaining architecture definition work should be focused on mapping out the technology and infrastructure capability in the Technology domain. In Phases E and F, the capability should be broken down into a set of Solution Building Blocks that will be implemented to realize the Target Architecture.
The Solution Building Blocks will provide the basis for the completed Architecture Definition Document that will be submitted for approval. Upon approval, the implementation team will conduct Compliance Assessments to ensure that the self-service capability is compliant with the overall Enterprise Architecture.
Answer: D
Explanation:
Section: Part 2
NEW QUESTION 35
Which of the following best describes the concept of Boundaryless Information Flow?
- A. Enabling effective global communications between countries
- B. Enabling the vision of an integrated information infrastructure
- C. Providing a visual representation of information provider, consumer and brokering applications
- D. Getting information to the right people at the right time in a secure, reliable and timely manner
- E. Enabling the flow of information to all stakeholders
Answer: D
NEW QUESTION 36
Scenario
Please read this scenario prior to answering the Question
Your role is that of Lead Enterprise Architect for a chain of convenience stores. The chain includes over 15,000 retail outlets throughout the Asia-Pacific region. Each store in the chain is an independently owned and operated franchise. The stores operate 24 hours a day and 7 days a week. Many of the stores have been with the franchise for more than 10 years and still use the original IT systems deployed at that time.
The CEO of the chain has stated his concerns about the inefficiencies of the current systems and identified the need to change. He has defined a new strategic vision that will enhance the business by providing its franchisees new services to help them compete with other retail outlets and online retailers. This strategy is part of the long-term commitment to enhance the brand image and increase revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year.
These changes will help to provide the chain with improved products, and more efficient operations. The stores will also act as delivery and return locations for a large online retailer which will further increase the number of potential customers. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising and new products to specific regions.
The chain has a mature Enterprise Architecture practice based in its headquarters and uses the TOGAF standard as the method and guiding framework. The CIO is the sponsor of the activity.
The Chief Architect engaged the services of a leading consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations.
Based on the recommendations from the initial study, the decision for the chain to adopt a packaged suite of integrated applications that is tailored to the needs of the franchise has been taken.
Refer to the scenario
You have been asked by the Chief Architect to propose the best approach for architecture development to realize the CEO's vision.
Based on TOGAF standard, Version 9.2, which of the following is the best answer?
- A. You propose that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.
- B. You propose that the team focus on architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement. You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and secure.
- C. You propose that the target architecture is defined first, followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.
- D. You propose that this engagement define the baseline architecture first in order to assess the current infrastructure capacity and capability. The initial priority is to understand the problem. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.
Answer: C
Explanation:
Section: Part 2
NEW QUESTION 37
Complete the sentence. The Requirements Management Phase _____________________.
- A. is used to dispose of resolved requirements for all ADM phases
- B. is a central process that prioritizes requirements for all ADM phases
- C. addresses and resolves requirements between ADM phases
- D. stores requirements and manages their flow into relevant ADM phases
- E. generates new requirements and passes them to all ADM phases
Answer: D
Explanation:
Section: Part 1
NEW QUESTION 38
Complete the sentence. TOGAF covers the development of four architecture domains, Application, Business, Data and__________.
- A. Capability
- B. Technology
- C. Transition
- D. Segment
- E. Vision
Answer: B
Explanation:
Section: Part 1
NEW QUESTION 39
- A. Based on all of these factors they have produced a risk assessment.
The implementation process is estimated to take four years. Because of the risks posed by the complexity of the current environment, a phased approach is needed to implement the target architectures. The Implementation and Migration Plan v0.1, the draft Architecture Roadmap, and the Capability Assessment deliverables are now complete.
Refer to the Scenario.
You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.
Based on the TOGAF standard, Version 9.2, which of the following is the best answer? - B. You would place the strategic Architecture Definition and Transition Architectures under configuration control as part of the ongoing architecture development cycle. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. You would then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be accepted by the Architecture Board as changes to the architecture without review.
- C. You would conduct a series of Compliance Assessments to ensure that the implementation team is implementing the architecture according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identified and updated in the Implementation and Migration Plan.
- D. You would apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. You would confirm the Transition Architecture phases using an Architecture Definition Increments Table to list the projects. You would then document the lessons learned and generate the final plan.
- E. You would assess how the plan impacts the other frameworks in use in the organization. The plan should be coordinated with the business planning, portfolio/project management and operations management frameworks. You would then assign a business value to each project, considering available resources and priorities for the projects. Finally, you would generate the Implementation and Migration Plan.
Answer: A,E
Explanation:
Section: Part 2
NEW QUESTION 40
Scenario
Please read this scenario prior to answering the Question
You are serving as the Lead Architect for an enterprise architecture project team within a leading
multinational pharmaceutical and medical devices manufacturer. Its brands include numerous household
names for medications and first aid supplies.
The company has a long history of innovating new treatments for many common illnesses and diseases.
Prior to launching a new treatment, the company has to demonstrate Its effectiveness and safety in a set
of clinical trials that satisfy the regulatory requirements of the countries in the target markets. All clinical
trials are undertaken by its research laboratories, which employ over 10,000 people at separate facilities in
the United Kingdom, United States, Sweden, France, Canada, India, China and Japan. In addition to
internal research and development activities the company is also involved in publicly funded collaborative
research projects, with other industrial and academic partners.
The Enterprise Architecture group within the company has been engaged in an architecture development
project to create a secure networked collaboration system that will allow researchers at its product
development laboratories worldwide to share information about their clinical trials. This system will also
connect with external partners.
The Enterprise Architecture group within the company has been engaged in an architecture development
project to create a secure networked collaboration system that will allow researchers at its product
development laboratories worldwide to share information about their clinical trials. This system will also
connect with external partners.
The Enterprise Architecture group is a mature organization. They use the TOGAF 9 ADM with extensions
required to support current good manufacturing practices and good laboratory practices in their target
markets. Due to the highly sensitive nature of the information that is managed, special care was taken to
ensure that each architecture domain included an examination of the security and privacy issues that are
relevant.
The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity.
She has stated that the changes to the enterprise architecture for the new system will need to be rolled out
in stages on a regional basis that minimizes disruptions to ongoing clinical trials.
Refer to the Scenario
You have been asked to recommend the approach to identify the work packages that will be included in
the Transition Architecture(s).
Based on TOGAF, which of the following is the best answer?
- A. Use a Consolidated Gaps, Solutions and Dependencies Matrix as a planning tool. For each gap
classify whether the solution is either a new development, purchased solution, or based on an existing
product. Group the similar solutions together to define the work packages. Regroup the work packages
into a set of Capability Increments to transition to the Target Architecture taking into account the
schedule for clinical trials. - B. Determine the set of Solution Building Blocks required by identifying which Solution Building Blocks
need to be developed and which need to be procured. Eliminate any duplicate building blocks. Group
the remaining Solution Building Blocks together to create the work packages using a CRUD matrix.
Rank the work packages in terms of cost and select the most cost-effective options for inclusion in a
series of Transition Architectures. Schedule the roll out of the work packages to be sequential across
the geographic regions. - C. Group the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix into
a set of work packages. Using the matrix as a planning tool, regroup the work packages to account for
dependencies. Sequence the work packages into the Capability Increments needed to achieve the
Target Architecture. Schedule the rollout one region at a time. Document the progression of the
enterprise architecture using a state evolution table. - D. Create an Implementation Factor Assessment and Deduction Matrix and a Consolidated Gaps,
Solutions and Dependencies Matrix. For each gap, identify a proposed solution and classify it as new
development, purchased solution, or based on an existing product. Group similar solutions together to
form work packages. Identify dependencies between work packages factoring in the clinical trial
schedules. Regroup the packages into a set of Capability Increments scheduled into a series of
Transition Architectures.
Answer: A
NEW QUESTION 41
Scenario:
Please read this scenario prior to answering the question
Your role is that of a consultant to the Lead Enterprise Architect in a company that speicializes in luxury electric cars and their powertrain components, and also produces battery-charging equipment. It has its own distribution network, its own showrooms, and sells directly to customers via the internet. The company has four manufacturing facilities, two in the North America, one in Europe, and one in Asia.
A challenge that the company is facing to scale up the number of vehicles coming off the production line to meed customer demand, while maintaining quality. At the moment there are supply chain storages for key electronic components related to the autonomous drive system. In response the this, the research arm of the company has pioneered the development of a new self-driving platform. This new design uses common off- the-shelf components that will allow for a significant increase in overall vehicle production. This new design is ready to go into production.
The company has a mature Enterprise Architecture practice that is supported by a cross-functional Architecture Board. The TOGAF standard is used for developing the automated manufacturing process and systems used to design, manufacture and test the new design. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
As part of putting the new self-driving platform into production, adjustments to the automated assembly processes need to be made. A pilot architecture project at a single location has defined an updated approach for controlling the automated test systems used to perform final quality assurance. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for immediate implementation at each plant.
Architecture Contracts have been developed that detail the work needed to implement and deploy the new automated test system controller for each location. The Chief Engineer has expressed concern that a uniform process be employed at each location to ensure consistency and quality.
Refer to the Scenario
The Lead Enterprise Architect has asked you to recommend the best approach to address the Chief Engineer's concern.
Based on the TOGAF standard, which of the following is the best answer?
- A. You use the Architecture Contracts to manage the architecture governance processes for the project across the locations. You deploy monitoring tools to assess the performance of each completed drive assembly at each location and develop change requirements if necessary.
You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition. - B. You create an Architecture Contract to manage and govern the implementation and migration process at each location. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract.
You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs. - C. You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization.
You recommend that if a deviation from the Architecture Contract is detected, the Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs. - D. You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract.
You schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
Answer: C
Explanation:
Section: Part 2
NEW QUESTION 42
Which of the following is an objective of Phase G, Implementation Governance?
- A. Prioritize the projects trough risk validation
- B. Establish the value realization process
- C. Assess the performance of the architecture and make recommendation for change
- D. Ensure that implementation projects conform with the Target Architecture
- E. Ensure that the enterprise's Architecture Capability meets current requirements
Answer: D
Explanation:
Reference http://pubs.opengroup.org/architecture/togaf8-doc/arch/chap13.html
NEW QUESTION 43
Scenario
Please read this scenario prior to answering the Question
Your role is that of a consultant to the Lead Enterprise Architect in a company that develops photovoltaic technologies for use in large-scale solar power farms. The company has three manufacturing facilities, two in the United States, and one in Southern France. Each of these facilities supplies a different manufacturer that assembles and sells complete systems. The solar panels and photovoltaic arrays are custom engineered to meet each manufacturer's design specifications.
A challenge that the solar power industry has faced is the efficiency of energy conversion. When a conventional solar panel overheats, it becomes inefficient and generates less energy. In response to this, the research arm of the company has pioneered the development of a new solar panel design that will produce up to 50% more energy than standard solar panels when operating at elevated temperatures. This will allow the production of significantly more useable energy per square meter than from standard solar technology. This new design is ready to go into production.
The company has a mature Enterprise Architecture practice that is supported by a cross-functional Architecture Board. TOGAF 9 is used for developing the automated manufacturing process and systems used to design, manufacture and test the solar power technologies they produce. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
As part of putting the new solar panel design into production, a pilot architecture project at a single location has defined an updated standard approach for controlling the automated test systems used to perform final quality assurance. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for immediate implementation at each plant.
Architecture Contracts have been developed that detail the work needed to implement and deploy the new automated test system controller for each location. The Chief Engineer has expressed concern that a uniform process be employed at each location to ensure consistency and high yields.
Refer to the Scenario
The Lead Enterprise Architect has asked you to recommend the best approach to address the Chief Engineer's concern.
Based on TOGAF, which of the following is the best answer?
- A. You create an Architecture Contract to manage and govern the implementation and migration process.
If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it Is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization. You recommend that if a deviation from the Architecture Contract is detected, the Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs. - B. You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract. You schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
- C. You use the Architecture Contracts to manage the architecture governance processes for the project across the locations. You deploy monitoring tools to assess the performance of each completed solar panel assembly at each location and develop change requirements if necessary. You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
- D. You create an Architecture Contract to manage and govern the implementation and migration process at each location. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract. You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
Answer: B
NEW QUESTION 44
Which ADM phase defines the scope for the architecture development initiative and obtains approval to proceed with the architecture development?
- A. Phase A: Architecture Vision
- B. Requirements Management
- C. Phase B: Business Architecture
- D. Preliminary Phase
- E. Phase D: Technology Architecture
Answer: A
Explanation:
Reference https://pubs.opengroup.org/architecture/togaf9-doc/arch/chap06.html
NEW QUESTION 45
Scenario: MedInc Products Ltd.
Please read this scenario prior to answering the Question.
MedInc Products Ltd. is a leading medical device manufacturer in the highly competitive market for Migraine Headache Pain Management (MHPM) devices. These tiny wireless devices are implanted in the brain and can deliver a precise electric shock when the wearable Pain Control Unit (PCU) detects an increase in stress induced by the onset of a migraine headache. This technology will be a breakthrough in the treatment of this condition, and several competitors are striving to be the first to introduce a product into the market. However, all of them must demonstrate the effectiveness and safety of their products in a set of clinical trials that will satisfy the regulatory requirements of the countries in the target markets.
The Enterprise Architecture group at MedInc Products has been engaged in an architecture development project to create a secure networked collaboration system that will allow researchers at its product development laboratories worldwide to share information about their independent clinical trials. The Enterprise Architecture group is a mature organization that has been utilizing TOGAF for several years. The MedInc Architecture Development Method is strictly based on TOGAF 9 with extensions required to support current good manufacturing practices and good laboratory practices in their target markets. The project team has now completed the Business, Information Systems, and Technology Architecture phases and has produced a complete set of deliverables for each phase. Due to the highly sensitive nature of the information that is managed, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant for each domain. A corresponding Security Architecture has been defined.
The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity. He has stated that the changes to the enterprise architecture for the new system will need to be rolled out on a geographic basis that will minimize disruptions to ongoing clinical trials. The work will need to be done in stages and rolled out in geographical regions.
Refer to the Medlnc Products Ltd. Scenario
You are serving as the Lead Architect for the project team.
You have been asked to recommend the approach to identify the work packages that will be included in the Transition Architecture(s).
Based on TOGAF 9, which of the following is the best answer?
- A. Create an Implementation Factor Assessment and Deduction Matrix and a Consolidated Gaps, Solutions and Dependencies Matrix. For each gap, identify a proposed solution and classify it as new development, purchased solution, or based on an existing product. Group similar solutions together to form work packages. Identify dependencies between work packages factoring in the clinical trial schedules. Regroup the packages into a set of Capability Increments scheduled into a series of Transition Architectures and documented in an Architecture Definition Increments Table.
- B. Determine the set of Solution Building Blocks required by identifying which Solution Building Blocks need to be developed and which need to be procured. Eliminate any duplicate building blocks. Group the remaining Solution Building Blocks together to create the work packages using a CRUD matrix. Rank the work packages in terms of cost and select the most cost-effective options for inclusion in a series of Transition Architectures. Schedule the roll out of the work packages to be sequential across the geographic regions.
- C. Group the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix into a set of work packages. Using the matrix as a planning tool, regroup the work packages to account for dependencies. Sequence the work packages into the Capability Increments needed to achieve the Target Architecture. Schedule the rollout one region at a time. Document the progression of the enterprise architecture using an Enterprise Architecture State Evolution table.
- D. Use a Consolidated Gaps, Solutions and Dependencies Matrix as a planning tool. For each gap classify whether the solution is either a new development, purchased solution, or based on an existing product. Group the similar solutions together to define the work packages. Regroup the work packages into a set of Capability Increments to transition to the Target Architecture taking into account the schedule for clinical trials.
Answer: C
NEW QUESTION 46
Which of the following is defined by TOGAF as a representation of a system from the perspective of a related set of concerns?
- A. Architecture Building Block
- B. Viewpoint
- C. Capability Architecture
- D. View
- E. Statement of Work
Answer: D
NEW QUESTION 47
According to TOGAF, in which phase of the ADM should an initial assessment of business transformation readiness occur?
- A. Phase F
- B. Phase A
- C. Phase G
- D. Phase B
- E. Preliminary Phase
Answer: B