How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.
- A. Select a special MRP type inside the material master.
- B. Use a special item category in your material BOM (bill of material).
- C. Define the special procurement type inside the material BOM (bill of material).
- D. Select a special procurement type inside the material master.
Answer: C,D
NEW QUESTION # 21
You have maintained the parameters for simple discontinuation in the material master of a component.
Which business process will be affected if the available stock is zero the discontinuation date is in the past?
- A. Production order release
- B. Back flushing
- C. Material requirements planning
- D. Kanban
Answer: C
NEW QUESTION # 22
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.
- A. Option to use maketoorder production
- B. Option to forecast planning for production resources
- C. Reduced times for final assembly
- D. Reduced delivery times
Answer: C,D
NEW QUESTION # 23
What does the material type influence?
Note: There are 2 correct answers to this question.
- A. Whether the material is produced inhouse procured externally or both
- B. Which document types class categories are allowed
- C. Which material master screens appear in which sequence
- D. Which plantspecific plantindependent statuses are allowed
Answer: B,C
NEW QUESTION # 24
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing?
Note: There are 3 correct answers to this question.
- A. Post production costs to the planned order.
- B. Post the goods receipt for the finished product.
- C. Reduce run schedule quantities.
- D. Update statistics for the Business Information Warehouse.
- E. Create associated capacity requirements.
Answer: A,C,E
NEW QUESTION # 25
Your quality department detects a deviation in a raw material batch. Unfortunately this batch has already been used in production.
How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.
- A. Use the batch whereused list.
- B. Use batch determination.
- C. Use the Batch Information Cockpit.
- D. Use batch derivation.
Answer: A,C
NEW QUESTION # 26
Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.
- A. Production version
- B. Work center
- C. Material
- D. Plant
Answer: B,C
NEW QUESTION # 27
You want to insert an operation at a certain time on a work center in the graphical planning table.
The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched.
How does the insertion take place?
- A. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- B. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
- C. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
- D. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
Answer: B
NEW QUESTION # 28
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender?
Note: There are 2 correct answers to this question.
- A. Inhouse production time
- B. Planned delivery time
- C. Total replenishment lead time
- D. Operation duration
Answer: A,B
NEW QUESTION # 29
What is a work center hierarchy?
- A. A group of alternative work centers for production structured in hierarchy levels by priorities
- B. A group of work centers in a parallel sequence that is used to split production quantities work on them in parallel
- C. A group of alternative work centers providing a cumulative available capacity for production
- D. A group of work centers in a production line being used in sequence for production
Answer: C
NEW QUESTION # 30
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material?
Note: There are 2 correct answers to this question.
- A. Procurement type
- B. MRP type
- C. MRP group
- D. Material type
Answer: A,D
NEW QUESTION # 31
You want to reduce planning efforts for B C classified materials.
Which planning procedure do you recommend?
- A. Advanced Planning
- B. Subassembly Planning
- C. Consumption Based Planning
- D. Material Requirements Planning
Answer: C
NEW QUESTION # 32
What does forecasting in the dem planning cycle include?
Note: There are 3 correct answers to this question.
- A. Past quotation quantities
- B. Oneoff events
- C. Market intelligence
- D. Past sales order quantities
- E. Past production planning quantities
Answer: B,C,D
NEW QUESTION # 33
What are some SAP recommended guiding principles to achieve clean core operations?
Note: There are 3 correct answers to this question.
- A. Establish release management.
- B. Establish an organizational structure technical foundation transformation methodology for clean core.
- C. Integrate clean core practices in the endtoend value process chain.
- D. Define roles responsibilities as part of a process transformation office.
- E. Establish regular housekeeping tasks procedures.
Answer: A,B,D
NEW QUESTION # 34
What will happen in the MRP run if you have created a new MRPrelevant material that supports both inhouse production external procurement?
- A. The MRP run assumes external procurement.
- B. The MRP run does NOT consider the material; it has to be planned interactively.
- C. The MRP run assumes inhouse production.
- D. The MRP run plans the material only if a quotation has been maintained.
Answer: C
NEW QUESTION # 35
Which options do you have to plan both quantities capacities during line loading in repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Assign planned orders manually in the planning table.
- B. Run MRP with automatic selection of production version.
- C. Run PP/DS heuristics for repetitive manufacturing.
- D. Run MRP with quota arrangement.
Answer: C,D
NEW QUESTION # 36
You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.
- A. Master data selection
- B. Order type determination
- C. Actual cost calculation
- D. Capacity requirements determination
- E. Planning selection
Answer: A,B,D
NEW QUESTION # 37
What data can you maintain in the subitems of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Status
- B. Quantity
- C. Installation point
- D. Scrap percentage
Answer: B,C
NEW QUESTION # 38
Where do you maintain data to determine the duration of an operation for production?
Note: There are 2 correct answers to this question.
- A. Production version
- B. Work center
- C. Material master
- D. Routing